- Excessive labor cost, power cost, construction cost
- Maintenance difficulty such as operation
Our technology
- 22% cost reduction compared to before based on LCC analysis (3.0m x 3.0m)
- Outstanding persisting period through stainless steel
Previous technology
- Complex and various constructions such as civil, mechanical, electrical, telecommunication, etc.
- Interference between process due to complex process
Our technology
- Work period reduction by 1/2 through mechanical production and simple process
- Can be installed in existing drain
Previous technology
- Blackout, control mistake, failure exist
- Operator exposed to danger such as electric shock, drowning, etc.
Our technology
- Automatic operation without operator or power
- Completely blocks risk factors
Previous technology
- Cut off from ecological system
- Causes water pollution such as grease filling
Our technology
- Used as ecological passageway through constant opening
- No CO2 or environmental pollution
Previous technology -Complex structure and requires professional management Our technology -Easy maintenance through simple structure